Version 7 (modified by lhella, 13 years ago) |
---|
Daily Drilling Report 1.2
Mission and Goal
This project is initiated by EPIM as a followup to the two previous Daily Drilling Report Projects.
The proposed objectives of the project:
- To include proposed additions for partner reporting to the DDR XML schema (DDRML) version 1.1
Schedule
- The project started November 2010 based on the approved EPIM RUF Work Specification 2010
Documentation
All project documentation will be stored in a document repository
Deliverables
Proposed deliverables:
- Updated DDR 1.2
- XML Schema annotated with SAWSDL providing links to the dictionary
- Updated XSLT (proposed standard report)
- Updated dictionary (concepts and definitions) with valid URIs (link addresses)
- Documentation
- Updated semantic report
- Change log
- Proposed next step
- Test example
Participants
The following are the parties contracted by EPIM for doing the planned work in the project:
- POSC Caesar Association (PCA)
- Project management
- Updates to the PCA/ISO15926 reference data
- Capgemini
- Updates to the XML Schema
- Creation of transformation rules and standard html report layout
- DNV
- Assist PCA on updates to the PCA/ISO15926 reference data