Changes between Version 8 and Version 9 of SigMmtMom191213

Show
Ignore:
Timestamp:
12/20/13 13:40:55 (10 years ago)
Author:
lhella (IP: 85.221.54.157)
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SigMmtMom191213

    v8 v9  
    3131 
    3232'''5. A.O.B'''[[BR]]  
    33 Hans is about to prepare a Batch 2 for review, and we propose that the material is prepared for the next MMT meeting. For ongoing projects, a continuation of review of templates for individuals would be preferred as they will be very useful. Hans is therefore encouraged to choose such templates in the next batch. We aim for a conclusion about the first batch at the next meeting, and can proceed with batch 2 after that. 
     33Hans is about to prepare a Batch 2 for review, and we propose that the material is prepared for the next MMT meeting. For ongoing projects, a continuation of review of templates for individuals would be preferred as they will be very useful. Hans is therefore encouraged to choose such templates in the next batch. We aim for a conclusion for the first batch at the next meeting, and can proceed with batch 2 after that. 
    3434 
    3535=== Action Items === 
Home
About PCA
Reference Data Services
Projects
Workgroups