= Mandate for PCA Industry Information Semantic Architecture Special Interest Group = == Purpose == * Develop architecture * At logical level, with examples of possible implementation architectures * Including information access and governance * Communicate how ISO15926 and other standards are being used and interlinked * Ensure industry relevance == Tasks == * Define a ”work process vs. Information Technology Architecture and Information Management Architecture” matrix * Spanning Engineering, Production, Operation and Maintenance. * Align relevant semantic technologies, models and standards * Design architecture supporting use cases: * Initially these two usecases: Handover from EPC to owner /operators. and remove / replace operation * Subsequently: Application interfacing, to the execution environment * Include relevant standards artifacts as part of architecture, * Provide documentation * Deliver as an update to OLF Reference Architecture for IO G2 * Provide demonstrator * Architecturally relevant demonstrations * Provide a small representative model supporting use cases * Focus on what is practical, implementable and result-oriented == Organization == * Key parties in the industry * Owner/Operators (e.g. Statoil, Woodside, NWU, Total) * EPC companies (e.g. Bechtel, Aker Solutions) * Standards representatives (e.g. PCA/ISO15926, Open O&M/MIMOSA) * Software vendors (e.g. IBM, Bentley, Aveva) * System Integrators, Analyst, Consultancies (e.g. IBM, Computas, DNV, Assetricity) * Educational institutions (e.g University of Oslo, University of South Australia) * Industry associations (e.g OLF) * Composition across organization categories * Composition across geography * Organize in * Core Team * Extended team * Align with Open O&M Operation and Maintenance SIG, * ref Markus Stumptner, University of South Australia (DISCUSS) * PCA’s staff handles administrative tasks. * Reporting to the PCA GM == Way of working == * Work program to be provided * Work format * Full team (core team and extended team) meet two times per year * At least one face to face in conjunction with other major conference * Core team meet more frequently * and ahead of full team meetings * Ad-hoc working groups/projects may be established when needed * Collaboration through virtual and appropriate tools, * PCA WIKI * Governance * Comply with PCA and member general policies and practices, including Intellectual Property policies == Duration == The SIG will run until it is terminated as agreed by the Board