Changes between Version 2 and Version 3 of SigICMom161018

Show
Ignore:
Timestamp:
10/18/16 15:46:38 (8 years ago)
Author:
darijuss (IP: 85.221.54.157)
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • SigICMom161018

    v2 v3  
    11= FIATECH PCA Instrument and Control, October 18th 2016 = 
    22=== Time and place === 
    3 18.10.2016, 3.00PM - 4.00PM (CET) [[BR]] !GoToMeeting ([wiki:SigInst/Internal/MeetingConnect how to connect] - need login)[[BR]]  Next meeting: October 18th 2016, 3.00-4.00PM CET 
     318.10.2016, 3.00PM - 4.00PM (CET) [[BR]] !GoToMeeting ([wiki:SigInst/Internal/MeetingConnect how to connect] - need login)[[BR]]  Next meeting: November 1st 2016, 3.00-4.00PM CET 
    44 
    55=== Attendees === 
     
    1717 8. Agenda for the next meeting.[[BR]]  
    1818 9. Review of Actions[[BR]]  
    19  10. A.O.B.[[BR]]  
     19 10. A.O.B. - Seattle meeting [[BR]]  
    2020 
    2121=== Minutes of Meeting === 
    2222 
    23  
    2423 1. Approval of agenda.[[BR]]  
     24  Approved. A briefing on Seattle meeting is added under AOB.[[BR]] 
    2525 
    2626 2. Approval of MoM.[[BR]]  
     27  Approved. [[BR]] 
    2728 
    2829 3. Status of DEXPI incl. model for instrumentation.[[BR]]  
    29  
     30  DEXPI meeting at Frankfurt. Major topics covered there: [[BR]]  
     31   - CAE implementation progress[[BR]]  
     32   - Beta testing[[BR]]  
     33   - Finishing the EQP model and[[BR]]  
     34   - Cooperation with OPC UA[[BR]]  
     35   
    3036 4. Status of STI.[[BR]]  
     37  WG 1 Instruments and WG 2 electro are progressing with their work. No new information released. [[BR]]  
    3138 
    3239 5. Top classes of instruments.[[BR]]  
     40  Discussed in the Seattle meeting. The proposal has been accepted to be used to upgrade Part 4. Documentation needs to be improved. PCA drafts proposal for the ad-hoc group approval. [[BR]]  
    3341 
    3442 6. CDD and Hierarchy in PCA RDL[[BR]]  
     43  David Leal made first cut on CDD data model and Part 2. Presentation will be available as a part of MoM from Seattle meeting. [[BR]]  
    3544 
    3645 7. Coordination between STI, ISDD, and possibly DEXPI, CFIHOS [[BR]]  
     46  ISDD have completed a proof of concept using:[[BR]] 
     47   - API 610 Horizontal and Centrifugal pump[[BR]] 
     48   - ISA Control Valve Data Sheet Form S20.50.xlt[[BR]] 
     49   - API 660 Tube and Shell Heat Exchanger [[BR]] 
    3750 
    3851 8. Agenda for the next meeting.[[BR]]  
     52{{{  
     53 1. Approval of agenda[[BR]]  
     54 2. Approval of MoM[[BR]]  
     55 3. Status of DEXPI incl. model for instrumentation[[BR]]  
     56 4. Status of STI[[BR]]  
     57 5. Top classes of instruments[[BR]]  
     58 6. CDD and ISO 15926 [[BR]]  
     59 7. Coordination between STI, ISDD, and possibly DEXPI, CFIHOS [[BR]]  
     60 8. Agenda for the next meeting[[BR]]  
     61 9. Review of Actions[[BR]]  
     62 10. A.O.B. - Seattle meeting [[BR]] }}}[[BR]] 
    3963 
    4064 9. Review of Actions[[BR]]  
     65'''15.07''' Open [[BR]]  
     66'''16.07''' Open, revised. [[BR]]  
     67'''16.12''' Open [[BR]]  
     68'''16.13''' Open. Properties will be assign. [[BR]]  
     69'''16.14''' Open. Perhaps Alan Johnston can be asked to replace Ray this. Nils to investigate this! [[BR]]  
     70'''16.15''' Closed. [[BR]]  
    4171 
    42  10. A.O.B.[[BR]]  
     72 10. A.O.B. - Seattle meeting[[BR]]  
     73  Change Request procedure is functioning, CR0001 has been started (normal procedure). Official voters are appointed. [[BR]] 
     74  Continuing work on a common reference data for SC4. [[BR]] 
     75  Productive meeting. [[BR]][[BR]]  
    4376 
     77Increase participation in the SIG. The best way to assure that is to get relevant project to collaborate together and coordinate results from different projects.[[br]] 
    4478 
    4579=== Action items === 
    4680'''15.07''' Quality assurance of new reference data items for instrumentation for including them in the PCA RDL. [[BR]]    
    47 '''16.07''' Hindrik to share IEC and ISA datasheet mapping. Mapping will be shared, nor ISA datasheets. [[BR]]   
     81'''16.07''' Darijus to upload IEC and ISA datasheet mappings. [[BR]]   
    4882'''16.12''' Hindrik to find out the IPR of property list.[[BR]]  
    4983'''16.13''' Update DEXPI instrumentation document with IEC properties. Heiner[[BR]]  
    50 '''16.14''' Coordinate development of properties among STI, ISDD, ISO-IEC projects (Bjørn, Ray to draft initial proposal on this)[[BR]]  
     84'''16.14''' Coordinate development of properties among STI, ISDD, ISO-IEC projects (Bjørn, Ray to draft initial proposal on this). Update: Nils to clarify if Alan could replace Ray.[[BR]]  
    5185'''16.15''' Update on ISO-IEC collaboration on CDD (Nils)[[BR]]  
Home
About PCA
Reference Data Services
Projects
Workgroups