Changes between Version 4 and Version 5 of SigICMom160621
- Timestamp:
- 06/21/16 16:07:33 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SigICMom160621
v4 v5 10 10 1. Approval of agenda. [[BR]] 11 11 2. Approval of MoM. [[BR]] 12 3. Datasheet standardization method used in the ISDD (Industry Standard Datasheet Definition) project (MIMOSA and Fiatech), p eresented by Ray12 3. Datasheet standardization method used in the ISDD (Industry Standard Datasheet Definition) project (MIMOSA and Fiatech), presented by Ray 13 13 4. Status of DEXPI incl. model for instrumentation. [[BR]] 14 14 5. Status of STI. [[BR]] … … 27 27 Approved.[[BR]] 28 28 29 3. Datasheet standardization method used in the ISDD (Industry Standard Datasheet Definition) project (MIMOSA and Fiatech), p eresented by Ray[[BR]]30 To take established datasheets and build digital transition from them to load them automatically. Target: operations and maintenance. [[BR]]31 The presented presentation is attached at the bottom of this page. 29 3. Datasheet standardization method used in the ISDD (Industry Standard Datasheet Definition) project (MIMOSA and Fiatech), presented by Ray[[BR]] 30 To take established datasheets and build digital transition from them to load them automatically. Target: operations and maintenance. Focus on the greenfield applications. Future work to demonstrate electronic transfer of datasheets.[[BR]] 31 The presented presentation is attached at the bottom of this page. It will be possible to recap the presentation at the next meeting, if requested. 32 32 [[BR]] 33 33 34 34 4. Status of DEXPI incl. model for instrumentation. [[BR]] 35 No status update today.[[BR]] 35 36 36 37 5. Status of STI. [[BR]] … … 39 40 40 41 6. Top classes of instruments. [[BR]] 42 Nothing to report. Work on top structure continues. [[BR]] 41 43 42 44 7. CDD and Hierarchy in PCA RDL[[BR]] 43 45 Nothing to report. More time is required. [[BR]] 44 46 45 47 8. Coordination of Reference Data development, maintenance and enhancement [[BR]] 46 48 PCA is participating with USPI coordinating CFIHOS work developing reference data. [[BR]] 47 49 48 50 9. Agenda for the next meeting. [[BR]] 49 51 We go back to the standard agenda. Ray may repeat presentation if necessary. [[BR]] 52 1. Approval of agenda. [[BR]] 53 2. Approval of MoM. [[BR]] 54 3. Status of DEXPI incl. model for instrumentation. [[BR]] 55 4. Status of STI. [[BR]] 56 5. Top classes of instruments. [[BR]] 57 6. CDD and Hierarchy in PCA RDL[[BR]] 58 7. Coordination of Reference Data development, maintenance and enhancement [[BR]] 59 8. Agenda for the next meeting. [[BR]] 60 9. Review of Actions [[BR]] 61 10. A.O.B. [[BR]] 50 62 51 63 10. Review of Actions [[BR]] 52 53 '''16.10''' Hindrik submitted after the last meeting. Attached to the minutes [https://www.posccaesar.org/wiki/SigICMom160607] [[BR]] 64 '''15.07''' Open. [[BR]] 65 '''16.07''' Open. [[BR]] 66 '''16.10''' Closed. Hindrik submitted after the last meeting. Attached to the minutes [https://www.posccaesar.org/wiki/SigICMom160607] [[BR]] 67 '''16.11''' Open. [[BR]] 54 68 55 69 11. A.O.B. [[BR]] 56 70 none.[[BR]] 57 71 58 72 === Action items === 59 73 '''15.07''' Quality assurance of new reference data items for instrumentation for including them in the PCA RDL. [[BR]] 60 74 '''16.07''' Hindrik to share IEC and ISA datasheet mapping.[[br]] 61 '''16.10''' Hindrik distribute a paper on instrument testing in take over process in chemical process plants vs oil and gas industry.[[BR]]62 75 '''16.11''' Consider bringing schematics from DEXPI to ISO. Next ISO meeting on 23rd of May, document should be delivered two weeks before. Heiner and Ray.[[BR]]