Changes between Version 1 and Version 2 of SigICMom160503
- Timestamp:
- 05/03/16 16:03:49 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SigICMom160503
v1 v2 1 1 = FIATECH PCA Instrument and Control, May 3rd 2016 = 2 2 === Time and place === 3 03.05.2016, 3.00PM - 4.00PM (CET) [[BR]] !GoToMeeting ([wiki:SigInst/Internal/MeetingConnect how to connect] - need login)[[BR]] Next meeting: May 24th 2016, 3.00-4.00PM CET3 03.05.2016, 3.00PM - 4.00PM (CET) [[BR]] !GoToMeeting ([wiki:SigInst/Internal/MeetingConnect how to connect] - need login)[[BR]] Next meeting: June 7th 2016, 3.00-4.00PM CET 4 4 5 5 === Attendees === 6 Bjørn Berli, Darijus Strasunskas (MoM)6 Hindrik Koning, Ray Topping, Bjørn Berli, Heiner Temmen, Manfred Theissen, Darijus Strasunskas (MoM) 7 7 8 8 === Agenda === … … 20 20 === Minutes of Meeting === 21 21 1. Approval of agenda. [[BR]] 22 Approved. Proteus schema22 Approved. Discussion of new version of Proteus schema (under AOB) 23 23 24 24 2. Approval of MoM. [[BR]] 25 25 Approved. 26 26 27 27 3. Status of DEXPI incl. model for instrumentation. [[BR]] 28 Came to the complete DEXPI model not only for instruments but piping too. Completed 5-6 static and rotating-mechanical equipment types. Important to use RDL id. 29 Final document is prepared and attached at the end of the minutes. 30 CAE vendors can start implementing as DEXPI specification is finished. 28 31 29 32 4. Status of STI. [[BR]] 33 Discipline engineers are working on instrument types and documents and drawing. working further on structuring properties for instruments. 30 34 31 35 5. Top classes of instruments. [[BR]] 36 Nothing new to report. Work on top hierarchy proceeds. 32 37 33 38 6. CDD and Hierarchy in PCA RDL[[BR]] 34 39 Nothing new to report. Work proceeds under STI. 40 35 41 7. Coordination of Reference Data development, maintenance and enhancement [[BR]] 42 Documents and approaches are exchanged in this SIG and seems to function. 36 43 37 44 8. Agenda for the next meeting. [[BR]] 38 45 46 the same agenda. 47 39 48 9. Review of Actions [[BR]] 40 49 '''15.07''' open. 50 '''16.07''' follow up to assure that correct files are received - DS, if so, close the action item. 51 '''16.08''' it is part of the Dexpi specification. Closed. 52 '''16.09''' the final specification received. Closed. 53 '''16.10''' follow up - DS 54 '''16.11''' follow up - DS 41 55 42 56 10. A.O.B. [[BR]] 43 57 Proteus schema presentation by Heiner and Manfred. Documents are attached at the end of the minutes. 44 58 45 59 === Action items ===