Changes between Version 6 and Version 7 of SigICMom050116
- Timestamp:
- 01/06/16 09:27:38 (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
SigICMom050116
v6 v7 43 43 '''6. Coordination of Reference Data development, maintenance and enhancement''' 44 44 A group to review changes has been approved: Magne, David, Hans and Leo. Terms of Reference are prepared, but not yet approved. This will include the top hierarchy of instrumentation.[[br]] 45 A form for updating PCA RDL has been prepared (based on the ISO procedure and form) . See attachements at the bottom of this MoM. Direct all comments and suggestions to Darijus.45 A form for updating PCA RDL has been prepared (based on the ISO procedure and form), see https://www.posccaesar.org/attachment/wiki/SigICMom050116/PCA%20RDL%20CR%20form.xlsx. See attachements at the bottom of this MoM. Direct all comments and suggestions to Darijus. 46 46 [[BR]] 47 47 … … 70 70 '''11. Review of Actions '''[[BR]] 71 71 15.03 is closed.[[BR]] 72 15.04 is closed. Section 5.1 Attached at the bottom of this MoM. [[BR]]72 15.04 is closed. Section 5.1 Attached at the bottom of this MoM. https://www.posccaesar.org/attachment/wiki/SigICMom050116/CSHEP%204%204%203-5%201%20Guideline%20Application%20of%20Safety%20Instrumented%20Systems%2002-02-2012%20Hee%20HKO%20in%20bewerking%20com%20hindrik.docx[[BR]] 73 73 15.05 remains open. After the meeting Hans provided a link to description of Extended Data Model: http://www.15926.org/topics/extended-data-model/index.htm [[BR]] 74 74 15.06 Properties are in the PCA RDL, but many of them do not have domain and range specified. In Part 4 they are in a separate spreadsheet too. Hindrik to send a copy of prolist / link to datasheets? [[BR]]