Version 23 (modified by jansenh, 16 years ago) |
---|
Drilling and Completion SIG
Table of Content
Internal discussion, related to SIG work processes?
Drill Pipe Inspection ontology?
Workshops & Technical Meetings?
News
December 20th 2007
POSC Caesar/DNV has finalized the first part of a study on Drill Pipe Inspection Reporting?. The work has been conducted by Magne Valen Sendstad @ DNV-IQM. A work-session with TracID is scheduled at January 10th, assigned to work through details in the material.
December 18th 2007
A SIG work meeting? was held on December 17-18 2007 at OLF @ Stavanger. The meeting was arranged as a workshop with emphasis on mapping XML/XSD types to ISO-15926, based on experience from the IIP project and the typ_baseTypeSchema.