Changes between Version 27 and Version 28 of RdsMaintenanceProcedure/simplified

Show
Ignore:
Timestamp:
06/26/14 21:41:07 (10 years ago)
Author:
hmottestad (IP: 79.160.41.193)
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • RdsMaintenanceProcedure/simplified

    v27 v28  
    139139A tool for generating this format can be found here: http://posccaesar.org/change-generator/#/ 
    140140 
    141 Once review by the PCA staff the changes will be pushed to the staging endpoint and become visible to users. The description of the changes will be made visible in the comments system. 
     141Once reviewed by the PCA staff the changes will be pushed to the staging endpoint and become visible to users. The description of the changes will be made visible in the comments system. 
    142142 
    143143The review period will be extended by up to 5 days to allow for further comments. 
    144144 
    145145== Ending procedure == 
    146 TODO: Write a summary of the ending procedure. 
     146 
     147Once the review process finishes, the submitter must contact PCA to have the new reference data included in the production endpoint. PCA will verify that the review process has proceeded according to the criteria and that all final requirements have been met. The last referenceData.ttl file will then be uploaded to the endpoint at http://data.posccaesar.org . 
     148 
     149An entry will be added to the log with a report of the review process and a description of the content. 
Home
About PCA
Reference Data Services
Projects
Workgroups