Changes between Version 27 and Version 28 of RdsMaintenanceProcedure/simplified
- Timestamp:
- 06/26/14 21:41:07 (9 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
RdsMaintenanceProcedure/simplified
v27 v28 139 139 A tool for generating this format can be found here: http://posccaesar.org/change-generator/#/ 140 140 141 Once review by the PCA staff the changes will be pushed to the staging endpoint and become visible to users. The description of the changes will be made visible in the comments system.141 Once reviewed by the PCA staff the changes will be pushed to the staging endpoint and become visible to users. The description of the changes will be made visible in the comments system. 142 142 143 143 The review period will be extended by up to 5 days to allow for further comments. 144 144 145 145 == Ending procedure == 146 TODO: Write a summary of the ending procedure. 146 147 Once the review process finishes, the submitter must contact PCA to have the new reference data included in the production endpoint. PCA will verify that the review process has proceeded according to the criteria and that all final requirements have been met. The last referenceData.ttl file will then be uploaded to the endpoint at http://data.posccaesar.org . 148 149 An entry will be added to the log with a report of the review process and a description of the content.