Changes between Version 2 and Version 3 of IdsAdiMatrixSubProject1

Show
Ignore:
Timestamp:
12/02/09 16:45:56 (14 years ago)
Author:
philrobins (IP: 80.254.146.20)
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IdsAdiMatrixSubProject1

    v2 v3  
    3333=== Level of compliancy === 
    3434 
    35 The exchange is at compliance category Yellow. That means the middleware for the exchange is non-compliant to ISO 15926, but the classification of the symbols and properties will be as per the WIP terms. 
     35The exchange is at Dictionary Level compliance category to ISO 15926. That means the exchange is by XML file with the classification of the symbols and properties as per the ISO15926 RDS/WIP terms. 
    3636 
     37=== History of the project === 
     38 
     39After the kickoff meeting for Matrix 1, Matrix 2 and Matrix 3 projects it was decided to join these initiatives, as the scope of each was complimentary and the data was orthogonal. 
     40 
     41Matrix 1 - Intelligent P&ID to P&ID Data exchange 
     42Matrix 2 - Intelligent 3D to 3D Data exchange 
     43Matrix 3 - Intelligent 2D to 3D Data Exchange 
     44 
     45The Matrix 1,2,3 project culminated in a demonstration at the April 2009 FIATECH conference in Las Vegas by 9 vendors showing exchange of data using an XML file transport that satisfied all 3 data exchanges. During the Matrix 1,2,3 project several items were acknowledged as being necessary to provide commercial, robust software solutions to the Process and Power industries but were shelved due to the time constraint of the conference.See [wiki:IdsAdiProject/IdsAdiProteusProject IDS-ADI Proteus Project] 
     46 
     47Project completed in April 2009  
     48 
Home
About PCA
Reference Data Services
Projects
Workgroups