TracNav menu
- Back to Avalon Collaboration Page
-
Introduction
- Overview
- Entry Points to Learning About ISO 15926
- Case Studies
- Principles of Interoperability
- Building a Business Case
-
Using ISO 15926 Tools
- Discovering the Right Class
- TC 184 SC 4 WG 3
- Using the RDS/WIP (RDL Façade)
- POSC/CAESER RDS
-
Tutorials
- Mapping to ISO 15926-4
- Using Templates
- Diagnostic Page
Owner/Operator Case Studies: 2003-01
Status of this document: Working Draft
This document is open for feedback, please post questions and comments in the forum at the bottom of this page. You will need a login to post in the forum.
Contents
Case Study 2003-01
Project Description
- Detail engineering started 2003.
- ?
Owner Requirements
- ...
- ...
Business Case
...
Scope ...
ISO 15926 Implementation
...
Significance of this project to ISO 15926
- ...
- ...