Changes between Initial Version and Version 1 of ISO15926HowTo_CaseStudy_OO_1998-01

Show
Ignore:
Timestamp:
11/17/09 00:04:20 (14 years ago)
Author:
gordonrachar (IP: 198.53.220.181)
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ISO15926HowTo_CaseStudy_OO_1998-01

    v0 v1  
     1[[TracNav(TracNav/ISO15926HowTo)]] 
     2 
     3= Owner/Operator Case Studies:  1998-01 = 
     4Status of this document: Working Draft 
     5 
     6This document is open for feedback, please post questions and comments in the forum at the bottom of this page. You will [WikiStart#Contactpoints need a login] to post in the forum. 
     7 
     8---- 
     9 
     10[[PageOutline(2-4,Contents,inline)]] 
     11 
     12 
     13== Case Study 1998-01 == 
     14 
     15'''Project Description''' 
     16  * Detail engineering started 1998. 
     17  * ? 
     18 
     19'''Owner Requirements''' 
     20  * A means of organizing the data from many different contractors and suppliers. 
     21  * Building relationships between the data across supplier boundaries to make it easier to find. 
     22 
     23'''Business Case''' 
     24  * Easier access to plant data. 
     25  * Personnel could access plant information through a single web portal from their desktops. 
     26  * Navigate visually through P&ID models. 
     27  * Engineering data integrated with other information. 
     28 
     29'''Scope''' 
     30  * ? 
     31  * ? 
     32 
     33 
     34'''ISO 15926 Implementation''' 
     35The physical plant project was already well under way when the owner decided to organize the plant information.  The "Information Project" became one of developing an information portal.  The underlaying data model was more-or-less the same as for the Oman LNG project.  The main difference was the user interface, an ordinary web browser. 
     36 
     37The ISO 15926 Part 2 data model was extended to include things like the Work Breakdown Structure, and relative priorities.  Most of the data modeling was simply fitting it into the organization: 
     38 
     39  * Structures and hierarchies of equipment 
     40  * Types and uses of data 
     41  * Different business processes 
     42 
     43'''Significance of this project to ISO 15926''' 
     44  * This was the second chance to try out the standardization of the Gellish templates. 
     45  * First draft of ''Usage'' ''Patterns'', which later were called ''Templates''. 
     46 
     47 
     48---- 
     49[[ViewTopic(ISO15926HowTo_CaseStudy)]] 
     50 
     51 
     52 
     53 
Home
About PCA
Reference Data Services
Projects
Workgroups