Version 6 (modified by gordonrachar, 15 years ago) |
---|
TracNav menu
Case Studies
Status of this document: Working Draft
This document is open for feedback, please post questions and comments in the forum at the bottom of this page. You will need a login to post in the forum.
Contents
Abstract
[Enter abstract]
Owner/Operator
These case studies focus on the information asset that was developed along with the physical plant. Emphasis is on how much of the information asset used ISO 15926 and which parts.
Shell - Oman LNG
Owner | Shell |
EPC | Chaioda, Foster Wheeler |
Detail Engineering | 1996 |
This project started at about the time people were talking about STEP AP221 (a.k.a ISO 10303 Application Protocol 221), and thinking there should be something more. It was out of these ideas, and on this project, that ISO 15926 was probably born.
For this project, Shell wanted a data warehouse for the plant information. It was envisioned as a big repository where all the suppliers could post information. No one had a clear idea what this data store would be used for beyond being a resource, since none of the engineering produciton tools of the day could work with an external data warehouse.
Initial requirement for information asset was a data warehouse standardized against STEP.
To be continued...
Shell/CNPC - Nanhai Petrochem
Owner | Shell, Chinese National Petroleum Company |
EPC | ?? |
Detail Engineering | 2003-2004 |
EPC Company
Original Equipment Manufacturer
Software Developer
AVEVA
Bentley Systems
Intergraph
General
Attachments
- AVEVA_Interop_Strategy.pdf (2.7 MB) - added by gordonrachar 14 years ago.
- Bentley_ISO15926.pdf (1.2 MB) - added by gordonrachar 14 years ago.
- Intergraph_Interop.pdf (1.1 MB) - added by gordonrachar 14 years ago.