Version 45 (modified by gordonrachar, 14 years ago) |
---|
TracNav menu
Case Studies
Status of this document: Working Draft
This document is open for feedback, please post questions and comments in the forum at the bottom of this page. You will need a login to post in the forum.
Contents
- Abstract
- Participating in an iRING Demonstration
- Owner/Operator Case Studies
- EPC Case Studies
- Equipment Manufacturer Case Studies
- Software Developer Case Studies
Abstract
[Enter abstract]
Participating in an iRING Demonstration
iRING is the brand name of some open source software tools that implement ISO 15926 parts 6, 7, 8, 9.
Digital Plant Conference 2010
The demonstration of iRING at the 2010 Digital Plant Conference is the second public demonstration of this open-source software. This case study documents the process.
Owner/Operator Case Studies
These case studies focus on the information asset that was developed along with the physical plant. Emphasis is on how much of the information asset used ISO 15926 and which parts.
Case Study 1996-01
Project Description
- 6.6 million metric tonne per annum (mmtpa) LNG plant.
- Located in the Middle East.
- Owned by a consortium of multinational oil companies and local government.
- Detailed engineering started in 1996.
- Data warehouse development started in 1997.
Case Study 1998-01
Project Description
- Offsore Natural Gas platform.
- Located in the Philippines.
- Gas field.
- 3,000 meters below sea level.
- 2.7 trillion cubic feet of natural gas.
- 85 million barrels of condensate.
- Detail engineering started 1998.
Case Study 2003-01
Project Description
- $4.3 billion Petrochemical Complex.
- Located in mainland China near Hong Kong.
- Products: styrene, propylene, ethylene and derivatives.
- Detail engineering started 2003.
Case Study Next
Project Description
- Detail engineering started ???.
- ?
EPC Case Studies
EPC Case #1
Company Description
- Large Multinational EPC.
- Has completed some of the world's largest projects.
ISO 15926 Implementation
- Struggled internally with the same issues that lead to ISO 15926.
- Major proponent today of the public acceptance of ISO 15926.
Another One
Company Description
- ?
- ?
Equipment Manufacturer Case Studies
OEM Case Study #1
Company Description
- One of the largest industrial instrument suppliers world-wide.
ISO 15926 Implementation
- Implementing ISO 15926 to eliminate the overhead of having to agree on terminology with customers at the beginning of new projects.
Another One
Project Description
- ?
- ?
Software Developer Case Studies
AVEVA
Aveva Interoperabilitiy Strategy
Meeting | POSC/Caeser |
Location | Kuala Lumpor |
Date | August 20, 2008 |
Bentley Systems
ISO 15926 for Bentley
Meeting | POSC/Caeser |
Location | ? |
Date | ? |
Intergraph
Standards-Based Interoperability, ISO15926 Tactical Update
Meeting | |
Location | Kuala Lumpor |
Date | September, 2008 |
Another One
Application Description
- ?
- ?
Attachments
- AVEVA_Interop_Strategy.pdf (2.7 MB) - added by gordonrachar 14 years ago.
- Bentley_ISO15926.pdf (1.2 MB) - added by gordonrachar 14 years ago.
- Intergraph_Interop.pdf (1.1 MB) - added by gordonrachar 14 years ago.