Version 36 (modified by gordonrachar, 14 years ago)

--

Case Studies

Status of this document: Working Draft

This document is open for feedback, please post questions and comments in the forum at the bottom of this page. You will need a login to post in the forum.


Contents

  1. Abstract
  2. Owner/Operator Case Studies
    1. Case Study 1996-01
    2. Case Study 1998-01
    3. Case Study 2003-01
  3. EPC Case Studies
    1. Another One
    2. Another One
  4. Equipment Manufacturer Case Studies
    1. Another One
    2. Another One
  5. Software Developer Case Studies
    1. AVEVA
    2. Bentley Systems
    3. Intergraph
    4. Another One

Abstract

[Enter abstract]

[wiki:ISO15926HowTo_CaseStudy_OO_1996-01 1996-01] [wiki:ISO15926HowTo_CaseStudy_OO_1996-01 1996-01] 1996-01

[[html(<span style="color: red">1996-01</span>)] ]

1996-01


Owner/Operator Case Studies

These case studies focus on the information asset that was developed along with the physical plant. Emphasis is on how much of the information asset used ISO 15926 and which parts.

Case Study 1996-01

Project Description

  • 6.6 million metric tonne per annum (mmtpa) LNG plant.
  • Located in the Middle East.
  • Owned by a consortium of multinational oil companies and local government.
  • Detailed engineering started in 1996.
  • Data warehouse development started in 1997.

Case Study 1998-01

Project Description

  • Detail engineering started 1998.
  • ?

Case Study 2003-01

Project Description

  • Detail engineering started 2003.
  • ?

EPC Case Studies

..

Another One

Project Description

  • ?
  • ?

Another One

Project Description

  • ?
  • ?

Equipment Manufacturer Case Studies

..

Another One

Project Description

  • ?
  • ?

Another One

Project Description

  • ?
  • ?

Software Developer Case Studies

..

AVEVA

Aveva Interoperabilitiy Strategy

Meeting POSC/Caeser
Location Kuala Lumpor
Date August 20, 2008

Bentley Systems

ISO 15926 for Bentley

Meeting POSC/Caeser
Location ?
Date ?

Intergraph

Standards-Based Interoperability, ISO15926 Tactical Update

Meeting
Location Kuala Lumpor
Date September, 2008

Another One

Project Description

  • ?
  • ?

Discussion

You have no rights to see this discussion.

Attachments

Home
About PCA
Reference Data Services
Projects
Workgroups