Version 34 (modified by gordonrachar, 14 years ago) |
---|
TracNav menu
Case Studies
Status of this document: Working Draft
This document is open for feedback, please post questions and comments in the forum at the bottom of this page. You will need a login to post in the forum.
Contents
- Abstract
- Owner/Operator Case Studies
- EPC Case Studies
- Equipment Manufacturer Case Studies
- Software Developer Case Studies
Abstract
[Enter abstract]
Owner/Operator Case Studies
These case studies focus on the information asset that was developed along with the physical plant. Emphasis is on how much of the information asset used ISO 15926 and which parts.
Case Study 1996-01
Project Description
- 6.6 million metric tonne per annum (mmtpa) LNG plant.
- Located in the Middle East.
- Owned by a consortium of multinational oil companies and local government.
- Detailed engineering started in 1996.
- Data warehouse development started in 1997.
Case Study 1998-01
Project Description
- Detail engineering started 1998.
- ?
Case Study 2003-01
Project Description
- Detail engineering started 2003.
- ?
EPC Case Studies
..
Another One
Project Description
- ?
- ?
Another One
Project Description
- ?
- ?
Equipment Manufacturer Case Studies
..
Another One
Project Description
- ?
- ?
Another One
Project Description
- ?
- ?
Software Developer Case Studies
..
AVEVA
Aveva Interoperabilitiy Strategy
Meeting | POSC/Caeser |
Location | Kuala Lumpor |
Date | August 20, 2008 |
Bentley Systems
ISO 15926 for Bentley
Meeting | POSC/Caeser |
Location | ? |
Date | ? |
Intergraph
Standards-Based Interoperability, ISO15926 Tactical Update
Meeting | |
Location | Kuala Lumpor |
Date | September, 2008 |
Another One
Project Description
- ?
- ?
Attachments
- AVEVA_Interop_Strategy.pdf (2.7 MB) - added by gordonrachar 14 years ago.
- Bentley_ISO15926.pdf (1.2 MB) - added by gordonrachar 14 years ago.
- Intergraph_Interop.pdf (1.1 MB) - added by gordonrachar 14 years ago.