Changes between Version 7 and Version 8 of EqHub
- Timestamp:
- 05/27/10 20:37:38 (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
EqHub
v7 v8 1 = EqHub - pre-qualified eqipment information delivery once and for all =2 EqHub is a project that is operated by [http://www.epim.no/ EPIM]. The officialEqHub project Web site can be found [http://www.eqhub.no/ here]. PCA is one of the suppliers in the project, and we will here shortly describe their role.1 = !EqHub - pre-qualified eqipment information delivery once and for all = 2 !EqHub is a project that is operated by [http://www.epim.no/ EPIM]. The official !EqHub project Web site can be found [http://www.eqhub.no/ here]. PCA is one of the suppliers in the project, and we will here shortly describe their role. 3 3 4 == Scope of Work for EqHub Standardization ==5 (PCA) will make the existing ISO 15926 reference data library (ISO 15926 RDL) available for EqHub and extend it to cover theEqHub scope. The existing ISO 15926 libraries have three levels of reference data, see figure below.4 == Scope of Work for !EqHub Standardization == 5 (PCA) will make the existing ISO 15926 reference data library (ISO 15926 RDL) available for !EqHub and extend it to cover the !EqHub scope. The existing ISO 15926 libraries have three levels of reference data, see figure below. 6 6 7 7 1. Reference data published by ISO as ISO Technical Specifications. Currently ISO TS 15926-3 Ontology for geometry and topology and ISO TS 15926-4 Initial reference data have been published … … 11 11 [[Image(levelsOfReferenceData.PNG)]] 12 12 13 Main tasks necessary to support EqHub with a high quality ISO 15926 reference data library:14 1. Enhance the PCA RDL, including templates, to cover the NorHub scope and improve the quality of the corresponding parts of the existing PCA RDL15 1. Run the PCA SIG approval of EqHub extensions16 1. Support ISO standardization of EqHub extensions17 1. Technical support of EqHub from PCA’s Reference Data Services (RDS)13 Main tasks necessary to support !EqHub with a high quality ISO 15926 reference data library: 14 1. Enhance the PCA RDL, including templates, to cover the !NorHub scope and improve the quality of the corresponding parts of the existing PCA RDL 15 1. Run the PCA SIG approval of !EqHub extensions 16 1. Support ISO standardization of !EqHub extensions 17 1. Technical support of !EqHub from PCA’s Reference Data Services (RDS) 18 18 1. Enhancements of the Reference Data Support System (RDSS) 19 19 1. Coordination and Quality Control 20 In the initial phase of EqHub most of the work will be concentrated on task 1. However, the PCA SIG approval process for theEqHub instrumentation extensions will also be done in the initial phase and this will require support from PCA. [[BR]]20 In the initial phase of !EqHub most of the work will be concentrated on task 1. However, the PCA SIG approval process for the !EqHub instrumentation extensions will also be done in the initial phase and this will require support from PCA. [[BR]] 21 21 22 An efficient RDSS is important for EqHub, and PCA and FIATECH have started a project to enhance this system. Necessary resources for this project are estimated to 65 man-months. Half of the costs will be covered by FIATECH. PCA must cover the other half.EqHub will be a large user of the RDSS and will have to contribute to the enhancements.[[BR]]22 An efficient RDSS is important for !EqHub, and PCA and FIATECH have started a project to enhance this system. Necessary resources for this project are estimated to 65 man-months. Half of the costs will be covered by FIATECH. PCA must cover the other half. !EqHub will be a large user of the RDSS and will have to contribute to the enhancements.[[BR]] 23 23 24 A large number of suppliers, contractors and owners/operators are expected to join EqHub. These will requirement a substantial amount of technical support from PCA’s RDS after the initiation phase.24 A large number of suppliers, contractors and owners/operators are expected to join !EqHub. These will requirement a substantial amount of technical support from PCA’s RDS after the initiation phase.