WITSML - Production Activity Component Schema.
Infomation about a lost production.
Information about the contaminants in water, and the general water quality.
Infomation about a shutdown event.
Infomation about an alarm.
Information about a marine operation.
Information about a cargo operation.
A comment about a kind of operation.
The time of the operation can be specified.