Version 4 (modified by lhella, 13 years ago)

--

Daily Drilling Report 1.2

Mission and Goal

This project is initiated by EPIM as a followup to the two previous Daily Drilling Report Project.
The proposed objectives of the project:

Schedule

  • The project started November 2010

Documentation

All project documentation will be stored in a document repository

Deliverables

Proposed deliverables:

  • Updated DDR 1.2
    • XML Schema annotated with SAWSDL providing links to the dictionary
    • Updated XSLT (proposed standard report)
    • Updated dictionary (concepts and definitions) with valid URIs (link addresses)
  • Documentation
    • Updated semantic report
    • Change log
    • Proposed next step
    • Test example

Participants

The following are the parties contracted by EPIM for doing the planned work in the project:

  • POSC Caesar Association (PCA)
    • Project management
    • Updates to the PCA/ISO15926 reference data
  • Capgemini
    • Updates to the XML Schema
    • Creation of transformation rules and standard html report layout
  • DNV
    • Updates to the PCA/ISO15926 reference data