Drill ReportIIPNO 30/9-F-9NO 30/9-F-9name2009-01-12T06:00:002009-01-13T06:00:00normal2009-01-13T12:00:2630/9-F-9NPD code30/9-F-9NPD code5857NPD number2006-07-23T00:00:00StatoilHydroKCA Deutag Drilling Norge ASOSEBERG SØRNPD Name280205NPD code2009-01-13T00:00:0053502645.617.5535053501.5836092230.413.37553442644.6formation integrity test-9999-999967.2Waited on production to finish testing of X-mas tree. Nippled up add-on spool, new drilling spool, HP riser, BOP and diverter.Pick up and make up 6 5/8" DP. Test add-on spool and HP riser connection.-99992009-01-12T06:00:002009-01-12T13:30:000fixedinterruption -- waitoksuccessWaited on production to finish testing of X-mas tree. Meanwhile completed test of standpipe manifold, rigged down manrider winch and installed mouse hole.2009-01-12T13:30:002009-01-12T14:00:000fixeddrilling -- bop/wellhead equipmentoksuccessHeld SJA meeting prior to heavy lift operation. 2009-01-12T14:00:002009-01-12T15:30:000fixeddrilling -- bop/wellhead equipmentoksuccessPrepared nippling operation. Picked up HP riser from deck and landed riser in spider.2009-01-12T15:30:002009-01-12T17:30:000fixedinterruption -- waitoksuccessWaited for production to shut in wells.2009-01-12T17:30:002009-01-12T19:00:000fixeddrilling -- bop/wellhead equipmentoksuccessRemoved hatches and lowered add-on spool to well head. Oriented add-on spool and connected same to well head.2009-01-12T19:00:002009-01-12T23:30:000fixeddrilling -- bop/wellhead equipmentoksuccessLowered down new drilling spool and made up same to add-on spool.2009-01-12T23:30:002009-01-13T00:00:000fixeddrilling -- bop/wellhead equipmentoksuccessLowered down HP riser on driling spool. Installed hatches in catedral.2009-01-13T00:00:002009-01-13T02:00:000fixeddrilling -- bop/wellhead equipmentoksuccessNippled up BOP, bell nipple and diverter.2009-01-13T02:00:002009-01-13T04:00:000fixeddrilling -- tripoksuccessLaid out 6 5/8" DP on deck. 2009-01-13T04:00:002009-01-13T05:00:000fixeddrilling -- tripoksuccessLaid down 6 5/8" HWDP, R2 from derrick to deck.2009-01-13T05:00:002009-01-13T06:00:000fixeddrilling -- tripoksuccessPicked up and made up 6 5/8" DP from deck. Racked stands in derrick.